Project 17CJ0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CJ0024","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, PINDANGAN 1ST SECTION (PHASE 2), CAMILING, TARLAC 1ST LD","Flood Control and Drainage","Completed",39446043.25,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2017-02-13","2017-08-04",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"306900000"]