Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17DD0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17DD0005","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, RESTORATION/IMPROVEMENT OF SLOPE PROTECTION/REVETMENT AT PUTING BUHANGIN BR. ALONG SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS","Flood Control and Drainage","Completed",9505682,0,100,"Batangas 4th DEO","Region IV-A","UBAMOS CONSTRUCTION CORPORATION (33380)","2017-02-28","2017-07-27",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"401000000"]
SHA-256
324fb6d25b4d527fe9172ed34e15161f84b5fefddcc9467d44a905438fb9ec2a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.