Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17DM0115

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17DM0115","CONSTRUCTION OF UNIQUE WORKSHOP LABORATORY BUILDING AT HAGONGHONG INTEGRATED HS, BUENAVISTA, QUEZON","Buildings and Facilities","Completed",3979417.44,0,100,"Quezon 3rd DEO","Region IV-A","MJIEL CONSTRUCTION AND SUPPLIES (37616)","2017-10-31","2018-02-27",2017,"Outside Infra - GAA 2017 DepEd BEFF",13.68851,122.47672,"405605000","405600000"]
SHA-256
beb488c2b6d9d0d02887b3a8f5600b81ad6450c9b56cb32eb91946bae0228fd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.