Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17DQ0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17DQ0004","MFO 2  FLOOD MANAGEMENT SERVICES, CONSTRUCTION- MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONARIVER, BRGY. LANTIC, CARMONA, CAVITE, 5TH LEGISLATIVE DISTRICT","Flood Control and Drainage","Completed",27927035.62,0,100,"Cavite 3rd DEO","Region IV-A","HAUSLAND CONSTRUCTION (32378)","2017-02-16","2017-06-15",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"402100000"]
SHA-256
3ab8b01ffc814b28df7d99098983f9cec849bee0592363bc585589b78c13858c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.