Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17EE0112

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17EE0112","CONSTRUCTION OF MAGARA  SCHOOL  FOR PHILIPPINE  CRAFTMEN 3-STOREY 15-CL ROXAS PALAWAN","GAA 2016 DepED BEFF","Completed",24076965.75,0,100,"Palawan 1st DEO","MIMAROPA Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-01-10","2018-11-28",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"1705300000"]
SHA-256
380bbb6435505fd878c9da48fab97b35804ea4c7b5761f5036dbac87acac9fe4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.