Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17EH0118

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17EH0118","REPAIR/REHABILITATION/IMPROVEMENT OF MABLARAN RIVER CONTROL, SAN ANDRES, ROMBLON","GAA 2016 NDRRMF","Completed",79507417.23,0,100,"Romblon DEO","MIMAROPA Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-01-22","2018-09-30",2016,"Outside Infra - GAA 2016 NDRRMF",12.622,122.042,"1705904000","1705900000"]
SHA-256
ff5be11707d452a6358b3248935f1b51f5c9e08a9377dc55ae43c36aed3223ab

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.