Project 17F00014
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17F00014","MFO1-IMPROVEMENT/WIDENING OF NATIONAL ROADS-OTHER PRIMARY ROADS: ROLANDO A. ANDAYA HIGHWAY, K0319+938.00-K0324+300.00 WITH EXCEPTIONS, RAGAY & SIPOCOT, CAMARINES SUR PROVINCE","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP, Roads: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation), Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",149093696.6,0,100,"Region V","Region V","E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST (7243)","2017-05-25","2018-08-28",2017,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP, Roads: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation), Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",13.79989,122.80526,"501730000","501700000"]
SHA-256
e933829568c370f6bd844e516dcd013ab3578b0bf63abfc0acae83a39f29199aHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.