Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17FB0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17FB0021","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF YAWA FLOOD CONTROL, LEGAZPI CITY, ALBAY 2ND LD","Flood Control and Drainage","Completed",32722232.89,0,100,"Albay 2nd DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2017-02-17","2017-06-15",2017,"Regular Infra - GAA 2017 MFO-2",13.165,123.73778,"500506000","500500000"]
SHA-256
deb829c72baf0f451e1b6f8e8d3399647f2c3f426ef031dfe7be11656f8c654f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.