Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17FB0143

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17FB0143","LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF BRGY. PERMANENT EVACUATION HOLDING CENTER/MULTI-PURPOSE BUILDING IN BRGY. RAWIS, LEGAZPI CITY, ALBAY","Buildings and Facilities","Completed",4829800.1,0,100,"Albay 2nd DEO","Region V","SDM VENTURES (39509)","2017-10-11","2018-03-09",2017,"Regular Infra - GAA 2017 LFP",null,null,null,"500500000"]
SHA-256
f9f76a43403923f8eec9aa2bf2488464cc383c6923b6b5d45a737e6e7fdd0835

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.