Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17FF0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17FF0038","OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG JUNCTION BINALAY (TINAMBAC) - TAMBAN ROAD (PAVING OF SHOULDER WITH DRAINAGE IMPROVEMENT, OLAG-PEQUEÑO, TINAMBAC, CAM. SUR, K0513+850-K0514+979, K0514+1007-K0516+015","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",45120610.94,0,100,"Camarines Sur 4th DEO","Region V","SPRING STAR CONSTRUCTION AND SUPPLY (20240)","2017-05-14","2017-10-05",2017,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",13.8221,123.3579,"501737000","501700000"]
SHA-256
2b3286c1eb52fe999d4ee9a2f87671ce32de85c7147e1daaa2ab160ed66c3e72

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.