Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17FH0202

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17FH0202","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT PAJO RIVER, BRGY. BUYO STA. 0+000-STA. 0+300, VIRAC, CATANDUANES","GAA 2018 OO-2","Completed",47520000,0,100,"Catanduanes DEO","Region V","AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY) (34481) / HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY (23385)","2018-03-09","2018-11-05",2018,"Regular Infra - GAA 2018 OO-2",13.61239,124.17478,"502011000","502000000"]
SHA-256
11def29534e4071c5dd7b716b138f6eacbae52a49d06017b76cdea6eb2de4753

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.