Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17FH0205

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17FH0205","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. GOGON, STA. 0+000-STA. 0+600 ALONG GOGON RIVER, VIRAC, CATANDUANES","Flood Control and Drainage","Completed",28409186.23,0,100,"Catanduanes DEO","Region V","C.T. LEONCIO CONSTRUCTION & TRADING (17371)","2018-04-16","2019-03-14",2018,"Regular Infra - GAA 2018 OO-2",13.57801,124.21509,"502011000","502000000"]
SHA-256
93c4249367d508201986e16f57e6c6ccd970a67256588ea4d69a34c3900d00fc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.