Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HA0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HA0038","CONSTRUCTION OF CAHAYAG RIVER CONTROL, TUBIGON, BOHOL-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TU","Flood Control and Drainage","Completed",18161566.56,0,100,"Bohol 1st DEO","Region VII","YS CONSTRUCTION (11928)","2017-04-26","2017-09-16",2017,"Regular Infra - GAA 2017 MFO-2",9.55,123.553,null,"701200000"]
SHA-256
a70561e32acb6a1baba2cebe336157deccaf0988b6a3ab1b258ebc4866e2aeb8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.