Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HE0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HE0004","CONTRUCTION OF FLOOD CONTROL STRUCTURE OF OCAÑA RIVER, CARCAR CITY, CEBU 1ST LD","Flood Control and Drainage","Completed",29402012.39,0,100,"Cebu 1st DEO","Region VII","VEN RAY CONSTRUCTION CORPORATION (18310)","2017-03-07","2017-11-15",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"702200000"]
SHA-256
4aa5cdf71d6c1c969f37ec4ac2e6f6727a47e10d78f4fd61c7d8c071b6769617

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.