Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HE0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HE0011","CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF LAMACAN RIVER (DOWNSTREAM AND UPSTREAM) LAMACAN, SIBONGA, CEBU 1ST LD","Flood Control and Drainage","Completed",27636630.14,0,100,"Cebu 1st DEO","Region VII","AR ADLAWAN CONSTRUCTION (13108)","2017-03-06","2017-10-13",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"702200000"]
SHA-256
ee1164d88f5b7eb02635d8ef5ab76f4c2077b0d6d2aac83095bba1bcdd846312

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.