Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HF0095

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HF0095","CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MANGOTO RIVER BASIN ALONG TOLEDO-PINAMUNGAJAN- ALOGUINSAN-MANTALONGON ROAD, STA. 00+110 - STA. 01+560, PINAMUNGAJAN, CEBU","Flood Control and Drainage","Completed",44098760.12,0,100,"Cebu 3rd DEO","Region VII","DUROS DEVELOPMENT CORP. (22729)","2017-07-09","2018-08-01",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"702200000"]
SHA-256
09412d5ec944f3c15d00cf62ee40aa0c9126f4481a893aacc5131733b2dcd529

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.