Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HH0131

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HH0131","CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES, BRGY. SAN NICOLAS PROPER, CEBU CITY","Flood Control and Drainage","Completed",3904666.34,0,100,"Cebu City DEO","Region VII","GOWIL BUILDERS (18733)","2018-02-21","2018-06-28",2018,"Regular Infra - GAA 2018 OO-2",10.2949,123.89191,"730600000","702200000"]
SHA-256
99f461b8f119a507c6ddb2aaee4051d90fcd781ce8bc119295be53afc1977c86

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.