Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HJ0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HJ0010","CONSTRUCTION OF BATERIA FLOOD CONTROL ALONG DUMAGUETE NORTH ROAD, GUIHULNGAN CITY, NEGROS ORIENTAL","Flood Control and Drainage","Completed",37227589.5,0,100,"Negros Oriental 1st DEO","Negros Island Region","QM BUILDERS (30743) / SUPREME MEGA STRUCTURE BUILDERS, INC. (38607)","2017-03-13","2018-02-11",2017,"Regular Infra - GAA 2017 MFO-2",10.12492,123.26942,"1804611000","1804600000"]
SHA-256
af233395fc6c5a28c1c1c314393fa6d44286f0eb90394d68d951ab09cd4b48e4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.