Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17HJ0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17HJ0015","CONSTRUCTION OF CABUGAN FLOOD CONTROL ALONG DUMAGUETE NORTH ROAD, BINDOY, NEGROS ORIENTAL","Flood Control and Drainage","Completed",9309712.4,0,100,"Negros Oriental 1st DEO","Negros Island Region","SYNDTITE CONSTRUCTION CORPORATION (FORMERLY: R.C. TAGALA CONSTRUCTION) (11597)","2017-03-19","2017-12-24",2017,"Regular Infra - GAA 2017 MFO-2",9.75318,123.1491,"1804607000","1804600000"]
SHA-256
470b1b2a00417bdd3fa13a7d90b5c495d3370d19671034f2a28bd8a2812bbb32

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.