Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17IF0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17IF0016","CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE - CONSTRUCTION OF BACAN FLOOD CONTROL, BRGY. TINAG-AN, ALBUERA, LEYTE, 4TH LD","Flood Control and Drainage","Completed",19381046.98,0,100,"Leyte 4th DEO","Region VIII","OCTAGON CONCRETE SOLUTIONS INC. (34475)","2017-02-17","2017-07-15",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"803700000"]
SHA-256
9edad4af9fce4d64c88e711e473500247351b54dd8113dd28688a7790f9cbcff

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.