Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17IF0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17IF0017","CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE - CONSTRUCTION OF PAGSANGAAN FLOOD CONTROL, BRGY. LILOAN, ORMOC CITY, LEYTE, 4TH LD","Flood Control and Drainage","Completed",18619809.1,0,100,"Leyte 4th DEO","Region VIII","PREMIUM MEGASTRUCTURES INC. (36079)","2017-02-17","2017-07-15",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"803700000"]
SHA-256
6bdb2479862e16a9abb18f1b9989fc8112559e5e5004d43aeff98e3045a7f422

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.