Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17IF0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17IF0045","CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PAGSANGAAN FLOOD CONTROL STRUCTURE, ORMOC CITY, LEYTE","Flood Control and Drainage","Completed",92149316.9,0,100,"Leyte 4th DEO","Region VIII","PREMIUM MEGASTRUCTURES INC. (36079)","2017-06-27","2018-05-31",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"803700000"]
SHA-256
a4f9b1a89a260b0b5c1b114b1c30e0ff1ea593d051608d0c1421492301724097

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.