Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17IG0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17IG0005","CONSTRUCTION OF PALHI FLOOD CONTROL STRUCTURE, BAYBAY CITY, LEYTE 5TH LD","Flood Control and Drainage","Completed",14332500,0,100,"Leyte 5th DEO","Region VIII","JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY) (32051)","2017-03-09","2017-10-04",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"803700000"]
SHA-256
f3a2dc6b073fb76958d6f9d4f561a60a65d8fc8ecc5825aaa73547be8541eb97

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.