Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17IJ0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17IJ0001","CONSTRUCTION OF FLOOD CONTROL, STRUCTURE ALONG CALBAYOG RIVER (UPSTREAM) BRGY. HAMORAWON, CALBAYOG CITY, SAMAR 1ST LD","Flood Control and Drainage","Completed",47711507.63,0,100,"Samar 1st DEO","Region VIII","B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) (9687)","2017-04-20","2017-09-15",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,"806000000"]
SHA-256
7eae5d1aaf32fb16172114edb3392f456a250c8aaa96a79dab4954dfe439146d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.