Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17JA0093

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17JA0093","CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TUMAGA RIVER BASIN, TETUAN-TUGBUNGAN SECTION, ZAMBOANGA CITY","Flood Control and Drainage","Completed",18790855.76,0,100,"Zamboanga City 2nd DEO","Region IX","AEJ HARDWARE CONSTRUCTION & ENTERPRISES (34740)","2017-07-28","2018-10-30",2017,"Regular Infra - GAA 2017 MFO-2",6.92375,122.09373,"931700000","907300000"]
SHA-256
aef01bd59e649eb6f3acc5e88c3f5b7f55f0b76492984edb8d933fb469254917

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.