Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17JB0201

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17JB0201","CONSTRUCTION OF ONE (1) UNIT TECHVOC UNIQUE WORKSHOP (7X22.5) BUILDING AT MOLITON NHS. PRES. MANUEL A. ROXAS, Z. N. (3 UNITS)","Buildings and Facilities","Completed",9913634.75,0,100,"Zamboanga del Norte 2nd DEO","Region IX","FFJJ CONSTRUCTION (16712)","2018-02-06","2020-10-26",2017,"Outside Infra - GAA 2017 DepEd BEFF",8.42882,123.18718,"907211000","907200000"]
SHA-256
acf0434e4d5a3c07f8eb6ae8d1e699fb394cddb5d288ce4c77a374bb55ef958a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.