Project 17LG0009

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17LG0009","PACKAGE 2017 - B- REHAB. / MAJOR REPAIR OF PERMANENT BRIDGE , DAVAO ORIENTAL  A.) REHAB. / MAJOR REPAIR OF PERMANENT BRIDGE AT TAGABEBE BRIDGE ( BO1135MN) ALONG TIBANBAN   LAVIGAN ROAD  B.)REHAB. / MAJOR REPAIR  OF PERMANENT BRIDGE  AT TAGAOM-OM  BRIDGE","Bridges-Rehabilitation-Concrete, Flood Control/Hydraulics/River Control","Completed",11656723.53,0,100,"Davao Oriental 2nd DEO","Region XI","MAER SUMMIT KONSTRUKT CO. (25262)","2017-03-01","2017-06-03",2017,"Regular Infra - Bridges-Rehabilitation-Concrete, Flood Control/Hydraulics/River Control",6.96954,126.30477,"1102509000","1102500000"]