Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17M00019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17M00019","ROAD UPGRADING (UNPAVED TO PAVED) ALONG MAITUM-LAKE SEBU ROAD, K1778+020-K1781+280 (CHAINAGE 11447-CHAINAGE 4407), BRGY. UPO-TUANA DATU SECTION, MAITUM, SARANGANI","Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP","Completed",144749934.82,0,100,"Region XII","Region XII","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2017-03-15","2018-06-07",2017,"Regular Infra - Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP",6.14919,124.46698,"1208005000","1208000000"]
SHA-256
18930b62a446fd0a2e9cf6dce622d96865ac48c64f668e4b1be2b6ea4f1e88c4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.