Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17MB0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17MB0022","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT UPPER MAKAR BRIDGE I ALONG MAKAR RIVER, STA. 0+000-STA. 0+488, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LD","Flood Control and Drainage","Completed",41045141.81,0,100,"South Cotabato 1st DEO","Region XII","J.G. ORANZA CONSTRUCTION (33370) / THREE W BUILDERS, INC. (10722)","2017-03-30","2017-10-15",2017,"Regular Infra - GAA 2017 MFO-2",6.08657,125.10267,"1230800000","1206300000"]
SHA-256
4a4679f69a5a931e2b052c6b5948f6a1ede61613f6dbf9cdb63d4240aa393ea1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.