Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17MC0071

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17MC0071","CONSTRUCTION OF FLOOD CONTROL DIKE APPROACH OF KABACAN BRIDGE, (STA. 0+522-STA. 0+933.4), BRGY. POBLACION, PRESIDENT ROXAS SIDE, PRESIDENT ROXAS, NORTH COTABATO -  CONSTRUCTION OF DIKE","Flood Control and Drainage","Completed",48999900,0,100,"Cotabato 2nd DEO","Region XII","VICENTE T. LAO CONSTRUCTION (7040)","2017-03-03","2018-11-12",2017,"Regular Infra - GAA 2017 MFO-2",7.14046,125.05493,"1204713000","1204700000"]
SHA-256
ed3f581b3d28fd6d7cae8ded2f33b9db149ec6e4ce512c9d09b3448c2197544c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.