Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17NF0119

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17NF0119","CONSTRUCTION OF WORKSHOP BUILDING/TUBOD NHS, TUBOD, SURIGAO DEL NORTE","Buildings and Facilities","Completed",3547298.65,0,100,"Surigao del Norte 2nd DEO","Region XIII","ASJ BUILDERS (35988)","2018-01-15","2018-05-09",2017,"Outside Infra - GAA 2017 DepEd BEFF",null,null,null,"1606700000"]
SHA-256
a358ec1e2bf51c3b2c794532607457b52f40136592df8b8c521761dc80b7a14e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.