Project 17NF0125
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17NF0125","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER FLOOD CONTROL (1ST APPROACH UPSTREAM)/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, K 0+111 - K 0+394","GAA 2018 OO-2","Completed",29339120.54,0,100,"Surigao del Norte 2nd DEO","Region XIII","CHARLZ CONSTRUCTION, INC. (8709) / CTB CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY : CTB ENGINEERING CONSTRUCTION) (30991)","2018-02-22","2018-08-26",2018,"Regular Infra - GAA 2018 OO-2",9.77446,125.48013,"1606724000","1606700000"]
SHA-256
5aed5532d4e287dc6aeb57cd66899d0ff6519f38978250549390451b8020d80dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.