Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17NH0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17NH0032","CONSTRUCTION OF TAGO CIS PROTECTION WORKS (DIVERSION WORKS), TAGO AND SAN MIGUEL, SURIGAO DEL SUR 1ST LD, SAN MIGUEL, SURIGAO DEL SUR","Flood Control and Drainage","Completed",5767735.38,0,100,"Surigao del Sur 1st DEO","Region XIII","ROWIE'S CONSTRUCTION (23595)","2017-04-17","2017-05-15",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"1606800000"]
SHA-256
50f0c714e49a8b9fb8ab7eceb5c908ff402e2fb3aeaa4fd23eb8616b1e771a23

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.