Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17NH0056

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17NH0056","PACKAGE 2 - CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM AT: LANUZA, CORTES, TANDAG CITY, TAGO & SAN MIGUEL, SURIGAO DEL SUR","Water Provision and Storage","Completed",916759.29,0,100,"Surigao del Sur 1st DEO","Region XIII","OLIN DEVELOPMENT ENGINEERING & CONSTRUCTION (26271)","2017-09-11","2017-10-25",2017,"Regular Infra - GAA 2017 MFO-3",9.20138,126.05914,"1606810000","1606800000"]
SHA-256
fde012a993a6cbd604b49aac060f9cb1e11cd2e42d81491706ea9516ca4e03f3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.