Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17NI0108

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17NI0108","CONSTRUCTION OF 1-UNIT 2 STOREY SCIENCE LABORATORY BUILDING BACULIN INTEGRATED SECONDARY SCHOOL (317924) HINATUAN, SURIGAO DEL SUR","Buildings and Facilities","Completed",9428214.28,0,100,"Surigao del Sur 2nd DEO","Region XIII","AGUERO CONSTRUCTION (23338)","2018-01-23","2019-07-11",2017,"Outside Infra - GAA 2017 DepEd BEFF",null,null,null,"1606800000"]
SHA-256
3816dac9431a2d0d131df247e7a33a36fe870ae1731b9ba9bfd1aae81c8f4e62

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.