Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17OA0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17OA0052","CONST. OF FLOOD CONTROL STRUCT./FLOODGATES ALONG CATMON RIVER, BRGY. TONSUYA AND CATMON, MAL. CITY","Flood Control and Drainage","Completed",9106845.34,0,100,"Malabon-Navotas DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2017-07-03","2017-10-28",2017,"Regular Infra - GAA 2017 MFO-2",14.66236,120.96145,"1380400000","1307500000"]
SHA-256
baadab806db4308e84ba25bec8c2c21a68c9b49aa5312ba0b81137b9d45fdc7f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.