Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17OD0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17OD0051","CONSTRUCTION OF FLOOD CONTROL WALL ALONG MEYCAUYAN RIVER, STA. 1+315 TO STA. 1+725, VALENZUELA CITY 1ST LD","Flood Control and Drainage","Completed",45519204.46,0,100,"Metro Manila 3rd DEO","National Capital Region","M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR (4072)","2017-05-22","2018-03-01",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,null]
SHA-256
34607a5180d8f8d0f49622d2386389d5f6e1704579d9b3e7923066971b882330

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.