Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17OF0198

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17OF0198","CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C.","Flood Control and Drainage","On-Going",247076302.13,0,40.04,"Flood Control Management Cluster","Central Office","R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)","2018-03-05",null,2016,"Regular Infra - GAA 2016 MFO-2",14.64497,121.00628,"1381300000","1307400000"]
SHA-256
aaa99915dfc50fea42d7a06c3da91d1d919b117e0d5074d1b7deba0e8606d520

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.