Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17PD0013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17PD0013","CONTRACT PACKAGE 4-CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYST: 1 CONST/REH. OF FLOOD MITIGATION FACILITIES ALONG BALILI RIVER (MAIN), BAGUIO CITY 2. CONST/REH. OF FLOOD MITIGATION FACILITIES ALONG BALILI RIVER (TRIBUTARIES)","Flood Control and Drainage","Completed",97381085.66,0,100,"Baguio City DEO","Cordillera Administrative Region","GOLDRICH CONSTRUCTION & TRADING (16489)","2017-03-30","2018-01-03",2017,"Regular Infra - GAA 2017 MFO-2",null,null,"1430300000","1401100000"]
SHA-256
446be2f50dc7d9e5da1cf74c89dcebc0f31aa3f9950f879d3c4cc0919b2cf39c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.