Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17PK0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17PK0024","CONSTRUCTION OF BUGNAY CREEK FLOOD CONTROL","Flood Control and Drainage","Completed",9161694.5,0,100,"Upper Kalinga DEO","Cordillera Administrative Region","A.I.P. CONSTRUCTION (32458)","2017-06-12","2018-01-25",2017,"Regular Infra - GAA 2017 MFO-2",null,null,null,null]
SHA-256
c31511e40b48ac3ab1c59d9503a21b51e64627090d97f84a1f8b99c561d4168c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.