Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17PL0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17PL0061","PACKAGE 8: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES ALONG MT. PROVINCE BDRY. -CALANAN-PINUKPUK-ABBUT ROAD (CALANAN-PINUKPUK SECTION) A). BOGBOG BR. (B02117LZ), B). MAPACO BR. (B02116LZ)","Bridges","Completed",8771140.47,0,100,"Lower Kalinga DEO","Cordillera Administrative Region","ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400) / UPLAND CONSTRUCTION AND ENGINEERING SERVICES (34866)","2017-04-10","2017-09-29",2017,"Regular Infra - GAA 2017 MFO-1",17.56518,121.43193,"1403209000","1403200000"]
SHA-256
1fae6ca22a2004c95b0394e7c80abc8b05bad41c42db3a565e4ada3b49c02d60

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.