Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17RF0085

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17RF0085","CONSTRUCTION OF 1 STOREY 3 CL SCHOOL BUILDING AT SOUTH POBLACION E/S (UNIT FIVE), AYUNGON, NEGROS ORIENTAL","Buildings and Facilities","Completed",3871356.17,0,100,"Negros Oriental 1st DEO","Negros Island Region","M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)","2017-12-12","2019-04-28",2017,"Outside Infra - GAA 2017 DepEd BEFF",null,null,null,"1804600000"]
SHA-256
049f425acd671f945bc3c67a7b3a68497050bacf03494a137db36385453e6a7e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.