Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17RF0109

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17RF0109","CONSTRUCTION OF 1 UNIT 3- STOREY 15 CL SCHOOL BUILDING AT AYUNGON NHS, AYUNGON, NEGROS ORIENTAL","Buildings and Facilities","Terminated",293476.35,0,100,"Negros Oriental 1st DEO","Negros Island Region","M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)","2017-12-24","2019-07-08",2017,"Outside Infra - GAA 2016 DepED BEFF, Outside Infra - GAA 2017 DepEd BEFF",null,null,null,"1804600000"]
SHA-256
e3491b608c32d856437958f199304fe61b1da8ce034b1864e0ea86f29887430b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.