FY2026 GAA: ₱6.79T
PisoScan

Project 17Z00005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17Z00005","REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT","GAA 2017 MFO-2","Completed",862000881.74,0,100,"Flood Control Management Cluster","Central Office","FR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS) (36719) / TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2017-10-13","2020-11-25",2017,"Regular Infra - GAA 2017 MFO-2",18.10458,120.71994,"102809000","102800000"]
SHA-256
1e00884065eaf17b6cff1dc3c76533144a4c00f4b67f0ffcbe9f5e7ecf51735f