Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17Z00019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17Z00019","PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY","Flood Control and Drainage","Completed",689348735.57,0,100,"Flood Control Management Cluster","Central Office","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2018-02-13","2023-10-20",2017,"Regular Infra - GAA 2017 MFO-2",14.66913,121.10004,"1381300000","1307400000"]
SHA-256
3c666bc8e004e946819d486718725b0436fea1696ca834b0b3ea9e73bc656456

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.