Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17Z00020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17Z00020","PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY","GAA 2017 MFO-2","On-Going",652330062.54,0,99.44,"Flood Control Management Cluster","Central Office","FERDSTAR BUILDERS INC. (4965) / R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)","2018-02-19",null,2017,"Regular Infra - GAA 2017 MFO-2",14.67551,121.10697,"1381300000","1307400000"]
SHA-256
e028c66b74f212b8219516b26b797a12514a317ad1a5d05822cf3a81e123c2d9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.