Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AA0357

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AA0357","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, RIGHT BANK UPSTREAM BANBAN BRIDGE, MUNICIPALITY OF BANGUI, ILOCOS NORTE","Flood Control and Drainage","Completed",24372996.11,0,100,"Ilocos Norte 1st DEO","Region I","FR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS) (36719)","2018-05-02","2018-10-05",2018,"Regular Infra - GAA 2018 OO-2",18.50739,120.7194,"102804000","102800000"]
SHA-256
a4942fcb6710ec40fece0fc9f6b44784698b0d96229e62909a949ab989480e97

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.