Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AC0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AC0015","CONSTRUCTION OF CABUGAO RIVER FLOOD CONTROL, BRGY. SALAPASAP, CABUGAO, ILOCOS SUR","Flood Control and Drainage","Completed",29168769.74,0,100,"Ilocos Sur 1st DEO","Region I","NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY (37062)","2018-02-12","2018-05-15",2018,"Regular Infra - GAA 2018 OO-2",17.8056,120.43137,"102905000","102900000"]
SHA-256
e381ef34f1879fa9eb4ce8e454d2cf847e55679b919fb732bd44e87a342a1ba2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.