Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18AC0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AC0040","CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER (PHASE II), BRGY. RAOIS, VIGAN CITY, ILOCOS SUR","Flood Control and Drainage","Completed",29400000,0,100,"Ilocos Sur 1st DEO","Region I","739 BUILDERS (31174)","2018-02-23","2019-03-20",2018,"Regular Infra - GAA 2018 OO-2",17.55922,120.43472,"102903000","102900000"]
SHA-256
2aadec871d890cfd3fad512e1ec293c905315b1c0b7983e10d3d92622f0ff6bc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.