Project 18AD0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18AD0015","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE CONTROL SYSTEMS-CONSTRUCTION OF POBLACION SUR F/C, SALCEDO, ILOCOS SUR","Flood Control and Drainage","Completed",9435451.35,0,100,"Ilocos Sur 2nd DEO","Region I","TRIBU DESIGN & CONSTRUCTION (12756)","2018-02-14","2018-12-03",2018,"Regular Infra - GAA 2018 OO-2",17.14184,120.5382,"102916000","102900000"]